Western Builder

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

SEH Receives Two Engineering Excellence Awards from ACEC-MN

10th Avenue Bridge SE Rehabilitation
10th Avenue Bridge SE Rehabilitation
Morningside Avenue/CSAH 15
Morningside Avenue/CSAH 15
MINNEAPOLIS, MN — Two SEH project teams received engineering excellence awards during the American Council of Engineering Companies of Minnesota’s (ACEC-MN) Annual Engineering Excellence Awards Program.

SEH received the Grand Award for the 10th Avenue Bridge SE Rehabilitation in Minneapolis, Minnesota, and an Honor Award for the Morningside Avenue/CSAH 15 in Glencoe, Minnesota.

ACEC-MN’s Awards Program recognizes engineering achievements that “exhibit the highest degree of merit and ingenuity.” Entries were judged by an objective panel based on “uniqueness and/or innovative application of new or existing techniques; future value to the engineering profession and perception by the public; social, economic, and sustainable development considerations; complexity; and successful fulfillment of client/owner needs.”

10th Avenue Bridge SE Rehabilitation – Minneapolis, Minnesota
The 10th Avenue Bridge is a critical transportation element that crosses over the Mississippi River in Minneapolis and serves a crucial role for people driving, biking, and walking each day. The goal of the project was to rehabilitate the historic bridge, which is listed on the National Register of Historic Places, to address the deterioration of critical components of the seven-span concrete arch of the bridge.

SEH, Olson & Nesvold Engineers (ONE), and the city led a thorough rehabilitation project, including removing and replacing the entire deck of concrete arch span portion of the bridge. Project highlights include using a cathodic protection system to protect the bridge’s arch ribs and using tower cranes for construction. Multimodal improvements included reducing vehicle lanes from four to two and adding sidewalks and protected bike lanes, supporting the city’s commitment to reducing carbon emissions.

Morningside Avenue/CSAH 15 – Glencoe, Minnesota
The reconstruction of Morningside Avenue/CSAH 15 fulfilled a long-time need for both the City of Glencoe and McLeod County regarding improving connectivity and safety. The project was made possible through extensive coordination and a cooperative agreement between the city and county. The process included a transparent outreach program to include the public and gather feedback about the project that had previously struggled with public objections.

The project features include a new regional highway connection, a roundabout, water main replacement, improved drainage to address local flooding, a regional trail connection, and a new railroad crossing.

SITECH
Your local Trimble Construction Division dealer
SITECH Northwest
LBX Link Belt Excavators
Your local Link Belt dealer
Hayden-Murphy Equipment Co
Komatsu Dealer Program
Your local Komatsu America Corp dealer
Road Machinery and Supplies Company